Low Water? We have your solution!!!!!!

 

                                    MARINAS

       Hot dipped Galvanize Barjoist Construction

"Browns Bridge exclusive full truss construction"

Strongest in the industry!!

  • 2"x2"x3/16" angle
  • 1/2" round rod
  • 3"x3"x1/4" cap angles
  • 45 degree bracing in all corners top and bottom
  • Structual barjoist every 4' with cross bracing in between top and bottom
  • Bolted with 3/8" bolt then welded for a supieror connection
  • All fingers are connected in middle of center section not at ends
  • Tie plates in all exterior joints

We will design a marina to suit your specifications

We offer a range of decking materials.

Concrete - Ipe' - Pine and others

 

      Secondary Construction

"like the others"

  • 1 1/2"x1 1/2"x3/16" angle for all structure
  • Box frame
  • 1"x1/8" for truss web
  • 3"x3"x3/16" for all tie places
  • 3/4" grade 8 bolt to secure struture

                                    

 

 

 

Jobs that we have done

We have one of the largest marina repair crews in the US. We have mobilized after storms within 12hrs on the weekends to other lakes with all equipment needed.

We enjoy fixing other companies work. It lets us know where docks fail and what not to do.

Browns Bridge Dock Company

(770) 887-9760

9540 Browns Bridge Road, Gainesville, GA 30506

jelliott@brownsbridgedock.com